News Flash

News Flash

Posted on: April 14, 2023

Hwy 169 Traffic Changes April 15-18

Hwy 169 Construction Changes April 2023

Work Zone Transitions April 15-18

Hwy 169 reduced to one-lane in each direction by April 19.

Hwy 169 between Main St. and 197th Ave.

  • Reduced to one-lane, each direction, 24-7, on the southbound side to construct the northbound road and bridges through early July.
  • Jackson Ave. and 193rd Ave. intersection will remain closed.
  • School St. and Elk Hills Dr. intersection will remain closed.

Local Access Changes

Motorists will be able to travel on various local access points.

  • Hwy 169 access will be open at Hwy 10, Main St. and the 197th Ave. interchange.
  • Temporary access along the corridor has been added to:
    • SB Hwy 169 from Holt St.
    • SB Hwy 169 to/from Freeport St.
    • NB Hwy 169 to/from Zane Ave.
    • NB Hwy 169 to Fifth St.
    • NB Hwy 169 to/from Evans St.
  • Added to assist with side street traffic flow:
    • Signal at Gates Ave. and Main St.
    • Signal at 179th Ave. and Twin Lakes Rd. NW
    • Compact roundabout on Evans St.

Pedestrians will have Hwy 169 crossings available at the signalized intersection at Main St., the pedestrian bridge north of School St./Elk Hills Dr. and at the 197th Ave. bridge.

Additional Info...
Facebook Twitter Email

Other News in News Flash

Farmers Market

2023 Farmers Market Season

Posted on: June 2, 2023
Elk RiverFest

Elk RiverFest 2023

Posted on: May 31, 2023
CartSwap

Garbage and Recycling Cart Swap

Posted on: May 24, 2023