PERMIT APPLICATION TYPE: | PERMIT SUBTYPE: | SUBMITTAL REQUIREMENTS: |
Building Permit - Commercial | - New Construction
- Addition
- Outbuilding
- Remodel
- Repair
|
*Plans must be signed by a State of MN Licensed Architect/Licensed Professional Engineer *Click HERE Version OptionsPermit Requirements TableHeadline to view Information Packet Construction Documents must include: - Building classification and type of construction
- Allowable height
- Allowable area
- Exiting
- Accessibility
- Energy code compliance
- Site Plan
- Elevations
- Details
- Door schedule
- Hardware schedule
- Wall schedule
- Bathroom fixtures
- Fire stopping
|
|
|
- Construction Drawings
- Structural Analysis
|
|
| |
|
| - Type of Roofing material
- Total Square Feet
|
Building Permit – Residential |
| *Click HERE to view Information Packet
- Construction Documents – Including:
- Foundation & Floor Blocking Detail
- Exterior Foundation Insulation & Flashing Detail
- Wall Bracing Detail
- Radon Detail
- Certificate of Survey
- Energy Code Compliance Certificate
- Structures Calculated Heat Loss & Gain
- Septic Design (if applicable)
|
| | *Click HERE Version OptionsPermit Requirements TableHeadline to view Information Packet |
|
- Addition
- Pool (In-Ground)
- Solar Energy (Freestanding)
- Retaining Wall (over 4 ft high)
|
Construction Documents Site Plan (preferably on existing survey) Solar plans must be engineered drawings. Retaining Wall plans must be engineered drawings. *Click HERE to view Pool Handout |
|
|
*Click HERE to view Pool Handout |
| |
- Construction Documents – Including:
- Aerial View:
- Proposed Deck Size
- Size & Spacing of floor joist
- Size & Type of decking material
- Size, type, location, & spacing of posts
- Size & type of beams
- Elevation View:
- Height of structure from grade
- Size & depth of footings
- Guardrail height & spacing
- Stairway rise & run
- Handrail height & design
|
|
- Remodel
- Basement
- Repair
- Solar Energy (Roof Mount)
- Windows/Doors (changed opening. i.e. egress window)
|
- Construction Plans
- Solar plans must be engineered drawings.
*Click HERE to view BASEMENT Information Packet |
| - Windows/Doors (existing opening)
- Reroof
- Reside
| - Windows/Doors: Number of Windows & Doors
|
|
| |
|
|
- Construction Plans (if applicable)
|
Fire System Permit |
|
- Number of Sprinkler Heads
- Sprinkler Plan
|
|
- Fire Suppression System - Inspection Permit (State Review)
| *Work involving 20 or more heads must submitted to the State Fire Marshal's Office for review
- Number of Sprinkler Heads
- Sprinkler Plan
- "Notice to Proceed" Letter from State Fire Marshal's review
|
|
- Fire Alarm / Monitoring System
| - Fire Alarm Plans (if applicable)
- Data Sheets
|
| - Tanks (Flammable / Combustible Liquids)
| - Site Plan showing Tank(s) location
|
Grading Permit | - Erosion Control
- Stormwater Management
- Culvert / Bridge
- Site Preparation
- Subdivision
- Landscaping
- Restoration
| - Site Plan
- Details:
- Project purpose
- Estimate start / end date
- Size of parcel
- Area of disturbance
- Volume of excavation / fill
- Impervious surface information
- Type of material to be removed or deposited
- Manner of removal / deposit
- Public road(s) affected
|
Mechanical Permit - Commercial | - New Construction
- Remodel
- Addition
- Fireplace
- Repair
- Replace
| *All plans, specs and calculations must be designed and signed by a registered professional mechanical engineer - Mechanical Plans
- Equipment / Gas Piping being installed
- Make / Model / Information on Appliance(s) (if replacement)
|
Mechanical Permit - Residential | - New Construction
- Replace
- Repair
- Remodel
- Addition
- Basement
- Fireplace
|
|
Plumbing Permit - Commercial | - New Construction
- Remodel
- Addition
- Repair
- Replace
| *Any work other than a "Minor Remodel" is required to be reviewed by the State - See State Checklist - Plumbing Plans (State stamped plans required if reviewed by State)
- Type and quantity of fixture(s) being installed
|
Plumbing Permit - Residential | - New Construction
- Replace
- Repair
- Remodel
- Addition
- Basement
| - Type and quantity of fixture(s) being installed
|
RPZ Permit | | *Permit not required for testing or repairs
|
Septic Permit |
- New Construction System
- Repair
- Replace
|
- Septic Design
- Completed Soil Verification Form(Soil Verification Inspection must be completed by designer prior)
- As-Built(must be submitted prior to final inspection to close out permit)
|
Sewer & Water Permit | |
- Size & Type of materials used
- Utility Plan (for Commercial projects)
- Separate Street Disruption / Right-of-Way permit may be required
- As-Built (must be submitted prior to final inspection to close out permit)
|
Sign Permit (*One permit per sign required) |
|
- Construction Documents with Sign Information:
- Sign Width
- Sign Height
- Total Sign Area
- Setback information
- Site Plan
|
|
|
- Construction Documents with Sign Information:
- Sign Width
- Sign Height
- Total Sign Area
- Façade Width
- Façade Height
- Total Façade Area
- Percentage of Wall Coverage
|
|
|
- Site Plan - use provided form HERE
- Must include Property Owner Signature
- Sign Subject / Event
- Sign Information:
- Sign Area in Square Feet
- Total Sign Height
- Sign Schedule
- Installation Date
- Removal Date
|
Street Disruption (Right-of- Way) Permit | - New Service
- Relocate
- Repair
- Other
|
- Utility Company / Contractor Contact
- Site / Location Plan
- Description of address/intersection
- Description of Start & End Point
- Utility Type
- Method of Construction
- Construction Schedule (Start & End Dates)
- Traffic Control Plan (if applicable)
- Street Repair Plan (if applicable)
- $5000 Escrow may be required if requested
|